Blog
Notes from the field.
How we run the work, what we have learned doing it, and the occasional opinion about parcel lockers. Written by the people who plan and do the jobs.
Coming next
What we are writing about.
New posts land here as we write them. If there is something you would like us to cover, tell us.
What a locker survey actually checks
Access, ground conditions, the power route, gradients, signage — and why a bad survey costs more than a bad install.
Why we plan routes by geography
What happened when we stopped allocating work by postcode string and started scoring it by the driving it adds.
PPM that is worth the visit
A checklist is only useful if somebody reads the answers. How we report a PPM round so it changes something.
Prefer to just ask us?
You do not have to read a blog post to find out how we would handle your estate. Just ask.