Royal Mail
Lockers · Survey · Install · PPM- What we do
- Site surveys for proposed locker positions, installation and commissioning, planned maintenance and reactive call-outs across the Royal Mail locker estate.
- How it runs
- The engineer completes the survey on their phone — proposed positions, access, ground conditions, the power route from the distribution board, trenching, gradients and signage — with a photograph against every question. Each suitable location is recorded separately, so one site visit can carry several proposed positions without anything being merged or lost.
- What they get
- A branded survey pack with every photograph in it, produced automatically on submission and filed the same day. Reactive and PPM visits come back in the same format, so the whole estate reads consistently.